IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1913 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $333 $1,120 Implemented
UK1913 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,855 $2,510 Implemented
UK1913 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $15,097 $10,570 Implemented
UK1913 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,770 $32,561 Implemented
UK1913 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $550 Implemented
UK1913 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,642 $2,520 Implemented
UK1913 # 08 Y:2019 08 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $127 Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1911 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $45,696 $27,825 Implemented
UK1911 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,273 $24,987 Implemented
UK1911 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,560 $3,950 Implemented
UK1911 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,363 $700 Implemented
UK1910 # 13 Y:2019 13 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,015 $0 Implemented
UK1910 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,342 $110,141 Implemented
UK1910 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $280 $161 Implemented
UK1910 # 08 Y:2019 08 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,365 $3,625 Implemented
UK1910 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $569 $300 Implemented
UK1910 # 09 Y:2019 09 2019 REDUCE FLUID FLOW RATES $1,484 $1,900 Implemented
UK1910 # 12 Y:2019 12 2019 OPTIMIZE PLANT POWER FACTOR $13,040 $16,170 Implemented
UK1910 # 11 Y:2019 11 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,251 $1,000 Implemented
UK1910 # 07 Y:2019 07 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $838 $350 Implemented
UK1910 # 04 Y:2019 04 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,283 $0 Implemented