IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,944

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0829 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $6,782 $8,620 Not Implemented
MA0829 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,700 $4,400 Implemented
MA0829 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,485 $1,000 Not Implemented
MA0829 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,278 $15,850 Not Implemented
MA0829 # 06 Y:2022 06 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,891 $4,445 Implemented
MA0829 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $5,100 Implemented
MA0828 # 01 Y:2022 01 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $443,207 $3,043,367 Not Implemented
MA0828 # 02 Y:2022 02 2022 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $127,245 $144,842 Not Implemented
MA0828 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $64,198 $280,195 Not Implemented
MA0828 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $29,256 $3,515 Not Implemented
MA0828 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,386 $12,000 Not Implemented
MA0828 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $522 $910 Not Implemented
MA0827 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,062 $75,000 Not Implemented
MA0827 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,909 $26,950 Implemented
MA0827 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,022 $11,050 Not Implemented
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
MA0827 # 05 Y:2021 05 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,962 $10,800 Not Implemented
MA0827 # 06 Y:2021 06 2021 MINIMIZE WATER USAGE $1,374 $3,230 Not Implemented
MA0827 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $801 $1,550 Not Implemented
MA0822 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $78,975 $422,509 Implemented
MA0822 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,003 $6,741 Implemented
MA0822 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,485 $4,500 Not Implemented
MA0821 # 01 Y:2020 01 2020 USE MINIMUM SAFE OVEN VENTILATION $48,924 $61,470 Not Implemented
MA0821 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $23,275 Not Implemented
MA0821 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $997 $1,400 Not Implemented