IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0452 # 01 Y:1999 01 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $4,467 $7,563 Implemented
MA0452 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $999 $480 Implemented
MA0452 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79 $35 Implemented
MA0448 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $558 $0 Implemented
MA0448 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,455 $80 Implemented
MA0448 # 04 Y:1999 04 1999 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $1,558 $5,000 Implemented
MA0448 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $1,425 Implemented
MA0449 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,001 $12,150 Implemented
MA0450 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $537 $0 Implemented
MA0449 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,706 $2,000 Implemented
MA0450 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $5,216 Implemented
MA0450 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,042 $1,000 Implemented
MA0450 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,892 $5,813 Implemented
MA0447 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $4,925 Implemented
MA0447 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $591 $120 Implemented
MA0447 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $473 $748 Implemented
MA0443 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $60 Implemented
MA0443 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $1,975 Implemented
MA0443 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $656 $150 Implemented
MA0443 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $927 $325 Implemented
MA0445 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,090 Implemented
MA0445 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,546 $472 Implemented
MA0444 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $322 $248 Implemented
MA0444 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $303 $117 Implemented
MA0444 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,858 $0 Implemented