Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
992
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0642 # 07 Y:2023 | 07 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,509 | $11,550 | Not Implemented |
WV0642 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,969 | $55,520 | Not Implemented |
WV0642 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,931 | $31,118 | Not Implemented |
WV0642 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $19,921 | $90,000 | Not Implemented |
WV0642 # 04 Y:2023 | 04 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,368 | $70,000 | Not Implemented |
WV0642 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,435 | $1,980 | Implemented |
WV0642 # 06 Y:2023 | 06 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,167 | $1,500 | Implemented |
WV0642 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,587 | $3,721 | Implemented |
WV0642 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $2,563 | $5,683 | Implemented |
WV0642 # 10 Y:2023 | 10 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,313 | $3,080 | Implemented |
WV0642 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,222 | $1,250 | Implemented |
WV0642 # 12 Y:2023 | 12 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,386 | $200 | Implemented |
WV0642 # 13 Y:2023 | 13 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $807 | $970 | Implemented |
WV0642 # 14 Y:2023 | 14 | 2023 | INSULATE BARE EQUIPMENT | $239 | $503 | Implemented |
DL0219 # 09 Y:2023 | 09 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $51,679 | $50,000 | Not Implemented |
DL0219 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,178 | $10,128 | Implemented |
DL0219 # 07 Y:2023 | 07 | 2023 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $2,856 | $16,145 | Not Implemented |
DL0219 # 06 Y:2023 | 06 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,196 | $50,000 | Implemented |
DL0219 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $10,600 | Implemented |
DL0219 # 04 Y:2023 | 04 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,827 | $0 | Implemented |
DL0219 # 03 Y:2023 | 03 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,246 | $4,000 | Not Implemented |
DL0219 # 02 Y:2023 | 02 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $922 | $520 | Not Implemented |
DL0219 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $496 | $0 | Implemented |
DL0217 # 13 Y:2023 | 13 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,390 | $11,744 | Not Implemented |
DL0217 # 12 Y:2023 | 12 | 2023 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,950 | $25,000 | Not Implemented |