IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0252 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,644 $261 Not Implemented
WV0252 # 11 Y:2002 11 2002 $3,000 $1,323 Not Implemented
WV0252 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,346 $1,200 Implemented
WV0252 # 03 Y:2002 03 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,869 $235 Implemented
WV0252 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $681 $235 Implemented
WV0252 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $553 $516 Not Implemented
WV0252 # 09 Y:2002 09 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $40,560 $500 Implemented
WV0252 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $0 Implemented
WV0252 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,714 $10,000 Not Implemented
WV0252 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,995 $235 Implemented
WV0252 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,432 $6,714 Not Implemented
LE0139 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $883 $2,000 Not Implemented
LE0139 # 01 Y:2002 01 2002 $97,133 $238,263 Implemented
LE0139 # 04 Y:2002 04 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,869 $7,000 Not Implemented
LE0139 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,359 $0 Implemented
WV0246 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,200 $400 Implemented
WV0246 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $3,472 $2,563 Implemented
WV0246 # 10 Y:2002 10 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $458 $830 Implemented
WV0246 # 08 Y:2002 08 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $787 $1,300 Not Implemented
WV0246 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $621 $1,140 Not Implemented
WV0246 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,264 $2,255 Not Implemented
WV0246 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,539 $0 Implemented
WV0246 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $0 Implemented
WV0246 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $656 $600 Not Implemented
WV0246 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,277 $240 Implemented