IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0305 # 06 Y:2000 06 2000 $15,000 $41,800 Implemented
ME0305 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $340 Implemented
ME0305 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $325 $225 Implemented
ME0305 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,193 Implemented
ME0305 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $187 $350 Not Implemented
ME0305 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $366 $357 Implemented
ME0304 # 05 Y:2000 05 2000 $29,835 $4,434 Implemented
ME0304 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $3,542 Not Implemented
ME0304 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,601 $3,600 Not Implemented
ME0304 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $152 $384 Not Implemented
ME0304 # 04 Y:2000 04 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,848 $0 Implemented
ME0303 # 04 Y:2000 04 2000 BURN WOOD BY-PRODUCTS FOR HEAT $631,036 $1,864,500 Not Implemented
ME0303 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,880 $44,850 Not Implemented
ME0303 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $11,195 $4,080 Not Implemented
ME0303 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $252,792 $97,800 Not Implemented
ME0303 # 05 Y:2000 05 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $184,216 $324,000 Not Implemented
ME0303 # 06 Y:2000 06 2000 $480,000 $0 Not Implemented
ME0302 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,862 $9,010 Not Implemented
ME0302 # 05 Y:2000 05 2000 $1,000,000 $0 Not Implemented
ME0302 # 04 Y:2000 04 2000 BURN WOOD BY-PRODUCTS FOR HEAT $879,619 $2,084,500 Not Implemented
ME0302 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,137 $6,000 Not Implemented
ME0302 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,620 $42,550 Not Implemented
ME0301 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,346 $7,200 Not Implemented
ME0301 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,500 $3,600 Not Implemented
ME0301 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,743 $35,073 Not Implemented