IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0032 # 04 Y:2008 04 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $757 $300 Implemented
MZ0032 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $0 Implemented
MZ0032 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $1,456 $712 Implemented
MZ0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,075 $43,400 Implemented
MZ0029 # 05 Y:2008 05 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6 $20 Implemented
MZ0024 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,181 $32,800 Implemented
MZ0024 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $900 Implemented
MZ0028 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $457 $500 Implemented
MZ0028 # 04 Y:2008 04 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $11,380 $7,000 Implemented
MZ0025 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,936 $1,400 Implemented
MZ0025 # 01 Y:2008 01 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $62 $200 Implemented
MZ0025 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $34 $300 Implemented
MZ0022 # 04 Y:2008 04 2008 ELIMINATE/REDUCE AN OPERATION $41,408 $0 Implemented
MZ0022 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,853 $5,458 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0023 # 05 Y:2008 05 2008 REPAIR OR REPLACE STEAM TRAPS $47,858 $40,000 Implemented
MZ0023 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,564 $27,000 Implemented
MZ0023 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $183 $80 Implemented
MZ0021 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,112 $21,425 Implemented
MZ0021 # 04 Y:2008 04 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $565 $40 Implemented
MZ0021 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,015 $5,000 Implemented
MZ0021 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,575 $900 Implemented
MZ0021 # 01 Y:2008 01 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $20,665 $20,000 Implemented
MZ0020 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $0 Implemented