IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0101 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $199 $297 Implemented
MZ0101 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,340 $8,800 Implemented
MZ0101 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,105 $1,160 Implemented
MZ0101 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $290 $360 Implemented
MZ0105 # 02 Y:2012 02 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $42,257 $4,645 Implemented
MZ0105 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,288 $2,000 Implemented
MZ0105 # 04 Y:2012 04 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,215 $52,200 Implemented
MZ0105 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $28,300 Implemented
MZ0100 # 01 Y:2012 01 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $10,313 $2,550 Implemented
MZ0100 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,458 $30,000 Implemented
MZ0106 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,267 $25,000 Implemented
MZ0106 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,893 $850 Implemented
MZ0106 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,969 $3,000 Implemented
MZ0106 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $5,174 $1,750 Implemented
MZ0106 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,548 $31,400 Implemented
MZ0099 # 01 Y:2012 01 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $43,935 $92,930 Implemented
MZ0099 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,358 $940 Implemented
MZ0099 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,108 $22,500 Implemented
MZ0099 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,144 $2,080 Implemented
MZ0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $33,200 Implemented
MZ0098 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $1,283 Implemented
MZ0098 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,896 $3,000 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
MZ0098 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,267 $26,000 Implemented
MZ0098 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,632 $23,700 Implemented