IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0239 # 02 Y:2003 02 2003 BURN WASTE OIL FOR HEAT $26,706 $36,010 n/a
MS0239 # 06 Y:2003 06 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,948 $252 Not Implemented
MS0239 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,839 $1,000 Implemented
MS0239 # 11 Y:2003 11 2003 INSTALL TIMERS AND/OR THERMOSTATS $222 $119 Not Implemented
MS0239 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,703 $2,350 Not Implemented
MS0239 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $427 Not Implemented
MS0239 # 05 Y:2003 05 2003 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,265 $6,000 Implemented
MS0239 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,196 $17,859 Implemented
MS0239 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $159,344 $600,000 Not Implemented
MS0239 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,584 $15,350 Implemented
MS0239 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $742 Not Implemented
MS0241 # 08 Y:2003 08 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,103 $1,102 Not Implemented
MS0241 # 11 Y:2003 11 2003 INSTALL TIMERS AND/OR THERMOSTATS $856 $1,575 Not Implemented
MS0241 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,802 $8,788 n/a
MS0241 # 10 Y:2003 10 2003 INSTALL OCCUPANCY SENSORS $1,004 $416 Not Implemented
MS0241 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $30,220 $20,410 Implemented
MS0241 # 07 Y:2003 07 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,613 $0 Implemented
MS0241 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,721 $7,328 Not Implemented
MS0241 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,854 $3,600 Implemented
MS0241 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $25,062 $2,486 Not Implemented
MS0241 # 04 Y:2003 04 2003 REPAIR AND ELIMINATE STEAM LEAKS $11,644 $760 Implemented
MS0241 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,378 $129 Implemented
MS0240 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $15,997 $980 Implemented
MS0240 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $228 Implemented
MS0240 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,995 $528 Implemented