IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,126 $422 Implemented
MS0265 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,775 $59,467 Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0262 # 09 Y:2004 09 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $815 $444 Implemented
MS0262 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,889 $406 Implemented
MS0262 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,422 $20,370 Implemented
MS0262 # 02 Y:2004 02 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,412 $1,518 Implemented
MS0262 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $918 $2,125 Implemented
MS0260 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $341 $408 Implemented
MS0260 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $348 Implemented
MS0259 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,277 $0 Implemented
MS0259 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,481 $245,000 Implemented
MS0259 # 06 Y:2004 06 2004 HEAT WATER WITH EXHAUST HEAT $5,972 $0 Implemented
MS0259 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,687 $150 Implemented
MS0257 # 06 Y:2004 06 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,318 $2,673 Implemented
MS0257 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,325 $348 Implemented
MS0257 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $36,924 $54 Implemented
MS0257 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $632 $1,029 Implemented
MS0257 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $67,341 $2,000 Implemented
MS0254 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,269 $288 Implemented
MS0253 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $1,526 $4,000 Implemented