IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0088 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $7,541 $11,782 Not Implemented
BS0088 # 02 Y:2016 02 2016 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $64,374 $480 Not Implemented
BS0088 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,994 $29,692 Not Implemented
BS0087 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,907 $27,896 Not Implemented
BS0087 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,873 $275 Not Implemented
BS0087 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $689 $5,040 Not Implemented
BS0087 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $32,576 $43,711 Not Implemented
CO0730 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,590 $1,680 n/a
CO0730 # 03 Y:2016 03 2016 COVER OPEN TANKS $7,390 $12,880 n/a
CO0730 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,690 $20,770 n/a
CO0730 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,620 $11,750 n/a
CO0729 # 01 Y:2016 01 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,080 $60,480 n/a
CO0729 # 02 Y:2016 02 2016 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $25,340 $123,200 n/a
CO0729 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,510 $51,780 n/a
CO0729 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,100 $6,040 n/a
CO0728 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,840 $6,000 n/a
CO0728 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $1,240 n/a
CO0728 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,300 $34,570 n/a
CO0726 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $1,630 n/a
CO0726 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $660 n/a
CO0726 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,470 $36,440 n/a
CO0726 # 04 Y:2016 04 2016 BURN WASTE OIL FOR HEAT $5,380 $5,270 n/a
CO0725 # 01 Y:2016 01 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,690 $100 n/a
CO0725 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,970 $1,390 n/a
CO0725 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $6,010 $620 n/a