IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0147 # 06 Y:1998 06 1998 $14,809 $0 Implemented
NC0147 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,282 $200 Implemented
NC0147 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $610 $500 Implemented
NC0147 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,356 $4,000 Implemented
NC0147 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $375 $200 Implemented
NC0152 # 03 Y:1998 03 1998 COVER OPEN TANKS $1,006 $100 Implemented
NC0152 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $563 $200 Implemented
NC0152 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,160 $0 Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
NC0141 # 02 Y:1998 02 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,943 $10,000 Implemented
NC0141 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,048 $4,000 Implemented
NC0141 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $4,236 Implemented
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented
TN0646 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $5,000 Implemented
TN0646 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $8,900 $13,600 Implemented
TN0646 # 02 Y:1998 02 1998 $28,800 $21,900 Implemented
TN0646 # 01 Y:1998 01 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $603,410 $51,350 Implemented
TN0646 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $0 Implemented
NC0145 # 06 Y:1998 06 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,125 $150 Implemented
NC0145 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,875 $100 Implemented
OD0119 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $400 Implemented
OD0119 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,088 $6,156 Implemented
OD0119 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,251 $8,135 Implemented
OD0119 # 06 Y:1998 06 1998 UPGRADE CONTROLS ON COMPRESSORS $1,518 $100 Implemented
OD0119 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $490 Implemented