Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0265 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $771 | $0 | Implemented |
KU0263 # 07 Y:1988 | 07 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $269 | $0 | Implemented |
KU0263 # 06 Y:1988 | 06 | 1988 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $187 | $0 | Implemented |
KU0263 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $219 | $0 | Implemented |
KU0263 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,486 | $1,308 | Implemented |
KU0263 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,211 | $1,600 | Implemented |
KU0263 # 02 Y:1988 | 02 | 1988 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,188 | $4,000 | Not Implemented |
KU0263 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,737 | $5,000 | Implemented |
KU0263 # 08 Y:1988 | 08 | 1988 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $108 | $0 | Not Implemented |
KU0263 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $610 | $920 | Not Implemented |
KU0266 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,274 | $1,008 | Implemented |
KU0266 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $282 | Implemented |
KU0265 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,309 | $2,400 | Not Implemented |
KU0266 # 05 Y:1988 | 05 | 1988 | RECOVER AND REUSE COOLING WATER | $791 | $860 | Implemented |
KU0265 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,325 | $0 | Implemented |
KU0265 # 11 Y:1988 | 11 | 1988 | RECOVER AND REUSE COOLING WATER | $7,327 | $6,400 | Implemented |
KU0265 # 06 Y:1988 | 06 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $606 | $700 | Implemented |
KU0266 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,624 | $100 | Implemented |
KU0265 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $1,548 | $400 | Not Implemented |
KU0265 # 04 Y:1988 | 04 | 1988 | INSTALL TURBULATORS | $2,263 | $1,250 | Implemented |
KU0266 # 03 Y:1988 | 03 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,166 | $7,300 | Not Implemented |
KU0265 # 08 Y:1988 | 08 | 1988 | IMPROVE LUBRICATION PRACTICES | $4,120 | $0 | Implemented |
KU0265 # 10 Y:1988 | 10 | 1988 | MINIMIZE WATER USAGE | $9,368 | $6,400 | Implemented |
KU0266 # 09 Y:1988 | 09 | 1988 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $396 | $580 | Implemented |
KU0265 # 03 Y:1988 | 03 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,892 | $5,000 | Implemented |