IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0448 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,612 $462 Implemented
KU0448 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $720 Implemented
CO0317 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,600 $150 Implemented
CO0317 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $2,070 Implemented
CO0317 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $1,340 Implemented
CO0317 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $300 Implemented
CO0317 # 09 Y:1994 09 1994 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $0 $140 Implemented
CO0316 # 05 Y:1994 05 1994 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $5,410 $300 Implemented
CO0316 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $7,530 Implemented
CO0316 # 07 Y:1994 07 1994 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $3,260 $700 Implemented
CO0316 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $2,710 $1,850 Implemented
CO0316 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,280 $6,120 Implemented
KU0443 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,623 $31,141 Implemented
KU0443 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $752 Implemented
KU0443 # 11 Y:1994 11 1994 COMBINE UTILITY METERS $156 $10 Implemented
KU0443 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,484 $11,400 Implemented
KU0443 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,178 $174 Implemented
KU0443 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,645 $150 Implemented
KU0443 # 10 Y:1994 10 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $180 Implemented
KU0443 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $465 $299 Implemented
KU0442 # 08 Y:1994 08 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,058 $2,075 Implemented
KU0442 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $325 Implemented
KU0442 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $130 Implemented
KU0442 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,066 $9,950 Implemented
KU0442 # 09 Y:1994 09 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,195 $8,640 Implemented