IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0786 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,650 $11,256 Not Implemented
MA0784 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,884 $24,000 Not Implemented
MA0784 # 07 Y:2017 07 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,491 $500 Not Implemented
MA0784 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,233 $16,685 Not Implemented
MA0784 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,498 $18,391 Implemented
MA0784 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,530 $41,013 Implemented
MA0784 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,360 $16,650 Not Implemented
MA0784 # 01 Y:2017 01 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,908 $71,450 Implemented
MA0778 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $8,708 $9,000 Not Implemented
MA0778 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,137 $11,649 Implemented
MA0778 # 03 Y:2017 03 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $17,175 $73,000 Implemented
MA0778 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $17,208 $14,500 Implemented
MA0778 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,550 $132,200 Not Implemented
MA0760 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $520 $62 Not Implemented
MA0760 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $500 Implemented
MA0760 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,981 $17,000 Implemented
MA0760 # 01 Y:2016 01 2016 REPLACE BOILER $8,072 $36,600 Not Implemented
MA0757 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,339 $648,870 Not Implemented
MA0757 # 01 Y:2016 01 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $95,137 $37,800 Implemented
MA0757 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $4,691 $2,718 Not Implemented
MA0757 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,924 $500 Implemented
MA0750 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,208 $3,000 Not Implemented
MA0750 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $5,289 $2,500 Not Implemented
MA0750 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $15,229 $15,000 Not Implemented
MA0750 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,398 $7,000 Not Implemented