IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0263 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $20,000 Not Implemented
LE0263 # 09 Y:2007 09 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,837 $6,837 Not Implemented
LE0263 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,639 $1,000 Not Implemented
LE0263 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $88,058 $368,500 Not Implemented
LE0263 # 07 Y:2007 07 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,256 $50,000 Not Implemented
LE0263 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,214 $1,000 Not Implemented
LE0263 # 02 Y:2007 02 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,097 $300 Not Implemented
LE0263 # 08 Y:2007 08 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $9,899 $22,894 Not Implemented
LE0263 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,515 $150,000 Not Implemented
LE0263 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,993 $70,000 Not Implemented
LE0263 # 10 Y:2007 10 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,781 $6,000 Not Implemented
LE0263 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $2,460 $1,200 Not Implemented
LE0256 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $11,733 Not Implemented
LE0256 # 02 Y:2007 02 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $15,602 $5,000 Not Implemented
LE0256 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,207 $1,200 Not Implemented
LE0256 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $689 $500 Not Implemented
LE0256 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,217 $500 Implemented
LE0256 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $4,138 $5,000 Not Implemented
LE0256 # 04 Y:2007 04 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,965 $35,200 Implemented
LE0256 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,536 $15,000 Not Implemented
LE0256 # 01 Y:2007 01 2007 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $101,767 $50,000 Not Implemented
LE0253 # 11 Y:2007 11 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,980 $510 Not Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
LE0253 # 06 Y:2007 06 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,436 $15,000 Not Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented