IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

303

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0574 # 04 Y:2005 04 2005 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,170 $1,150 Not Implemented
CO0574 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $162 $118 Implemented
CO0574 # 06 Y:2005 06 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $450 $110 Not Implemented
CO0574 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,000 $41,750 Not Implemented
CO0574 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,410 $1,420 Not Implemented
CO0574 # 09 Y:2005 09 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,350 $12,520 Not Implemented
CO0574 # 10 Y:2005 10 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,830 $6,160 Not Implemented
CO0574 # 11 Y:2005 11 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $840 $6,120 Not Implemented
CO0573 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $99,230 $295,000 Not Implemented
CO0573 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $1,030 Implemented
CO0573 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $961 $752 Implemented
CO0573 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $520 $2,950 Not Implemented
CO0573 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $500 $780 Implemented
CO0573 # 06 Y:2005 06 2005 USE SOLAR HEAT TO HEAT WATER $28,910 $121,820 Not Implemented
CO0573 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $8,750 $4,790 Implemented
CO0573 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,930 $13,186 Implemented
CO0573 # 09 Y:2005 09 2005 USE OPTIMUM THICKNESS INSULATION $3,590 $5,150 Not Implemented
CO0573 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,530 $0 Implemented
CO0573 # 11 Y:2005 11 2005 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,340 $0 Implemented
CO0573 # 12 Y:2005 12 2005 USE SOLAR HEAT FOR HEAT $730 $1,400 Not Implemented
CO0573 # 13 Y:2005 13 2005 RECOVER WASTE HEAT FROM EQUIPMENT $530 $1,600 Not Implemented
CO0573 # 14 Y:2005 14 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $340 $3,400 Not Implemented
CO0572 # 01 Y:2005 01 2005 INSTALL SKYLIGHTS $9,660 $40,800 Not Implemented
CO0572 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $7,700 Not Implemented
CO0572 # 03 Y:2005 03 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $2,480 $30,770 Not Implemented