IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

984

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0482 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $1,459 Implemented
AS0483 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $19,902 $520 Not Implemented
AS0483 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,493 $4,974 Not Implemented
AS0483 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $196 $226 Not Implemented
AS0483 # 04 Y:2020 04 2020 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $2,057 $1,070 Not Implemented
AS0482 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,090 $200 Implemented
AS0482 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $5,394 $416 Not Implemented
AS0483 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,222 $200 Not Implemented
AS0482 # 03 Y:2020 03 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,701 $160 Implemented
UU0145 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $373,488 $10,000 Not Implemented
UU0145 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $47,010 $23,850 Not Implemented
UU0145 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $4,719 Implemented
UU0145 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $377,567 $872,000 Not Implemented
UU0145 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $25,041 $5,000 Not Implemented
UU0145 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,566 $36,000 Implemented
UU0145 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $661 $440 Implemented
SF0448 # 05 Y:2014 05 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,825 $7,952 Implemented
SF0448 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,203 $17,082 Not Implemented
SF0448 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,941 $50 Not Implemented
SF0448 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,452 $0 Not Implemented
SF0448 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,956 $0 Implemented
SF0448 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,914 $40,248 Not Implemented
SF0349 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,603 $150 Not Implemented
SF0349 # 07 Y:2007 07 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,644 $8,646 Not Implemented
SF0349 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,042 $2,339 Not Implemented