IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

984

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0350 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,725 $2,550 Not Implemented
AS0350 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $921 $1,300 Not Implemented
AS0350 # 07 Y:2003 07 2003 $40,475 $57,000 Not Implemented
AS0349 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $758 $975 Implemented
AS0349 # 02 Y:2003 02 2003 INSTALL SKYLIGHTS $15,856 $33,200 n/a
AS0349 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $6,729 $9,784 n/a
AS0349 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,062 $56 Implemented
AS0349 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,556 $1,316 Implemented
AS0349 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,435 $5,084 Implemented
AS0349 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,638 $7,500 Implemented
AS0349 # 08 Y:2003 08 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $878,532 $1,880,000 n/a
AS0349 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $3,515 $0 Implemented
AS0349 # 10 Y:2003 10 2003 MINIMIZE WATER USAGE $138 $60 Implemented
AS0349 # 11 Y:2003 11 2003 $603,884 $11,220 Not Implemented
AS0340 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $5,518 Implemented
AS0340 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $340 $600 Not Implemented
AS0340 # 03 Y:2002 03 2002 INSTALL SKYLIGHTS $36,748 $54,898 Not Implemented
AS0340 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,190 $0 Not Implemented
AS0340 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $155 $20 Implemented
AS0340 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,051 $30 Not Implemented
AS0340 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $13,263 $6,971 Not Implemented
AS0340 # 08 Y:2002 08 2002 OPTIMIZE PLANT POWER FACTOR $6,618 $1,590 Not Implemented
AS0340 # 09 Y:2002 09 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,135 $13,732 Not Implemented
AS0340 # 10 Y:2002 10 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,400 $8,554 Not Implemented
AS0340 # 11 Y:2002 11 2002 $25,624 $4,800 Implemented