IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0100 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $419 Implemented
RU0100 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $410 $0 Implemented
RU0100 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $0 Implemented
RU0100 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $3,924 $5,255 Implemented
RU0100 # 05 Y:1990 05 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,300 $239 Implemented
RU0090 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $547 $15 Implemented
RU0091 # 10 Y:1990 10 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $946 $402 Implemented
RU0091 # 09 Y:1990 09 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $347 $239 Implemented
RU0091 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,092 $500 Implemented
RU0091 # 07 Y:1990 07 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,010 $5,040 Implemented
RU0091 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,072 $406 Implemented
RU0091 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $367 $2,297 Implemented
RU0091 # 04 Y:1990 04 1990 IMPROVE LUBRICATION PRACTICES $327 $800 Implemented
RU0091 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $424 $200 Implemented
RU0091 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $87 Implemented
RU0091 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $457 $0 Implemented
RU0090 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,573 $500 Implemented
RU0090 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $348 $350 Implemented
RU0090 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $68 Implemented
RU0089 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $521 $300 Implemented
RU0089 # 04 Y:1990 04 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,389 $2,520 Implemented
RU0089 # 03 Y:1990 03 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,780 $5,000 Implemented
RU0089 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,307 $500 Implemented
RU0088 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $650 Implemented
RU0083 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $3,851 $6,100 Implemented