IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0148 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $70 $60 Implemented
SU0148 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $31,584 $17,490 Implemented
SU0148 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,006 $3,700 Implemented
SU0148 # 03 Y:2002 03 2002 $14,400 $20,000 Implemented
SU0148 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $163,907 $767,895 Not Implemented
SU0148 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $25,533 $0 Implemented
SU0148 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $105 $0 Implemented
SU0148 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,438 $320 Not Implemented
SU0145 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $7,242 $23,410 Not Implemented
SU0145 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,309 $1,925 Not Implemented
SU0145 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $545 Not Implemented
SU0145 # 02 Y:2002 02 2002 RECOVER AND REUSE COOLING WATER $10,576 $10,750 Not Implemented
SU0145 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $280 $25 Implemented
SU0145 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $50 $129 Not Implemented
SU0145 # 01 Y:2002 01 2002 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $50,000 $250,000 Not Implemented
SU0146 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,500 $852 Implemented
SU0146 # 10 Y:2002 10 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $11 Implemented
SU0146 # 01 Y:2002 01 2002 $18,266 $35,000 Not Implemented
SU0146 # 04 Y:2002 04 2002 $4,723 $420 Implemented
SU0146 # 06 Y:2002 06 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $799 $1,690 Implemented
SU0146 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $791 $0 Implemented
SU0146 # 02 Y:2002 02 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $16,051 $38,750 Not Implemented
SU0146 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $383 $288 Not Implemented
SU0146 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,273 $61,828 Not Implemented
SU0146 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $494 $0 Implemented