IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0269 # 01 Y:1988 01 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $227 $0 Implemented
UD0269 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $633 Implemented
UD0268 # 02 Y:1988 02 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,128 $3,448 Implemented
UD0268 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,113 $0 Implemented
UD0268 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,096 $3,000 Implemented
UD0269 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,782 $5,000 Implemented
UD0269 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $242 $500 Implemented
UD0268 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $0 Implemented
UD0270 # 02 Y:1988 02 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,575 $1,000 Implemented
UD0270 # 01 Y:1988 01 1988 REDESIGN PROCESS $3,796 $1,000 Implemented
UD0266 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $21,603 $5,000 Implemented
UD0266 # 01 Y:1988 01 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,611 $600 Implemented
UD0266 # 07 Y:1988 07 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,266 $30,000 Implemented
UD0266 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,639 $11,475 Implemented
UD0266 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $462 $0 Implemented
UD0266 # 05 Y:1988 05 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,169 $20,000 Implemented
UD0265 # 02 Y:1988 02 1988 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $1,837 $6,300 Implemented
UD0264 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,732 $3,790 Implemented
UD0264 # 04 Y:1988 04 1988 INSTALL STORM WINDOWS AND DOORS $984 $929 Implemented
UD0265 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,041 $0 Implemented
UD0264 # 01 Y:1988 01 1988 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $677 $0 Implemented
UD0263 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,423 $1,000 Implemented
UD0260 # 05 Y:1988 05 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,399 $180 Implemented
UD0263 # 01 Y:1988 01 1988 OPTIMIZE PLANT POWER FACTOR $4,019 $15,000 Implemented
UD0263 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,295 $9,000 Implemented