IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0358 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $0 Implemented
UD0358 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,636 $0 Implemented
UD0358 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $0 Implemented
UD0358 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,464 $7,000 Implemented
UD0358 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $675 $0 Implemented
UD0358 # 03 Y:1991 03 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,145 $200 Implemented
UD0357 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,700 $0 Implemented
UD0357 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $500 Implemented
UD0357 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,022 $0 Implemented
UD0357 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $729 $0 Implemented
UD0357 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $194 $1,000 Implemented
UD0354 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,096 $0 Implemented
UD0354 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,636 $0 Implemented
UD0354 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,516 $0 Implemented
UD0354 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $3,907 $0 Implemented
UD0354 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $12,118 $4,375 Implemented
UD0352 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $593 $1,000 Implemented
UD0352 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,167 $1,500 Implemented
UD0352 # 03 Y:1991 03 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,569 $75,000 Implemented
UD0350 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $4,130 $0 Implemented
UD0350 # 01 Y:1991 01 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $22,101 $0 Implemented
UD0339 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,089 $0 Implemented
UD0339 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $5,000 Implemented
UD0340 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $5,952 $2,000 Implemented
UD0340 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,513 $0 Implemented