IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0659 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,464 $1,000 Implemented
UD0659 # 15 Y:2002 15 2002 DISCONNECT BALLASTS $392 $35 Implemented
UD0659 # 10 Y:2002 10 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,776 $120 Implemented
UD0659 # 01 Y:2002 01 2002 $103,190 $31,120 Implemented
UD0659 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $5,400 $6,750 Implemented
UD0658 # 01 Y:2002 01 2002 $962,280 $448,000 Implemented
UD0658 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,063 $8,000 Implemented
UD0658 # 02 Y:2002 02 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,837 $16,100 Implemented
UD0657 # 01 Y:2002 01 2002 $1,600,000 $339,333 Implemented
UD0657 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,470 $0 Implemented
WV0254 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,809 $600 Implemented
WV0254 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,833 $1,000 Implemented
WV0254 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $755 $600 Implemented
WV0254 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $3,154 Implemented
WV0254 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,172 $200 Implemented
WV0254 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $1,756 $483 Implemented
WV0254 # 14 Y:2002 14 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $100 Implemented
WV0254 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,240 $0 Implemented
WV0254 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,033 $120 Implemented
WV0254 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,987 $300 Implemented
WV0253 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,922 $0 Implemented
WV0253 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,975 $1,800 Implemented
WV0253 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,800 $40 Implemented
WV0253 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,713 $250 Implemented
WV0253 # 09 Y:2002 09 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122 $40 Implemented