IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0683 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $11,700 Implemented
UD0682 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,790 $3,000 Implemented
UD0682 # 07 Y:2003 07 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $4,800 $2,000 Implemented
UD0682 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $1,000 Implemented
UD0682 # 09 Y:2003 09 2003 $2,596 $0 Implemented
UD0680 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,465 $900 Implemented
UD0680 # 01 Y:2003 01 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $24,031 $500 Implemented
UD0680 # 10 Y:2003 10 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $3,078 $0 Implemented
UD0680 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,140 $0 Implemented
UD0680 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,750 $1,460 Implemented
UD0680 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,243 $14,256 Implemented
UD0680 # 11 Y:2003 11 2003 COVER OPEN TANKS $2,708 $1,375 Implemented
UD0680 # 13 Y:2003 13 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,815 $0 Implemented
UD0678 # 10 Y:2003 10 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,251 $2,000 Implemented
UD0678 # 09 Y:2003 09 2003 INSTALL TIMERS AND/OR THERMOSTATS $2,654 $1,000 Implemented
UD0678 # 11 Y:2003 11 2003 DISCONNECT BALLASTS $1,865 $90 Implemented
UD0678 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,900 $725 Implemented
UD0678 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,840 $0 Implemented
UD0678 # 08 Y:2003 08 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,745 $2,400 Implemented
UD0678 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $57,760 $0 Implemented
UD0678 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,500 $980 Implemented
WV0276 # 05 Y:2003 05 2003 USE OPTIMUM THICKNESS INSULATION $8,395 $2,640 Implemented
WV0276 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $744 $320 Implemented
WV0276 # 01 Y:2003 01 2003 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $41,760 $60,000 Implemented
WV0276 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $33,509 $580 Implemented