IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0650 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,073 $100 Implemented
OK0650 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $1,203 $1,190 Implemented
OK0648 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $12,108 $2,317 Implemented
OK0648 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,683 $240 Implemented
OK0648 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,975 $4,500 Implemented
OK0646 # 03 Y:2002 03 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $659 $0 Implemented
OK0646 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,545 $5,270 Implemented
OK0646 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $0 Implemented
OK0646 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $469 $93 Implemented
OK0652 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $2,551 $20 Implemented
OK0647 # 07 Y:2002 07 2002 $166,400 $208,754 Implemented
OK0647 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $42,712 $2,250 Implemented
OK0647 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $29,330 $9,344 Implemented
OK0647 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $11,788 $9,041 Implemented
OK0647 # 09 Y:2002 09 2002 INSTALL SET-BACK TIMERS $1,446 $372 Implemented
OK0649 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $3,504 Implemented
OK0649 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $104 $37 Implemented
OK0642 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,760 $9,780 Implemented
OK0642 # 06 Y:2002 06 2002 INSTALL SET-BACK TIMERS $2,130 $332 Implemented
OK0642 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $446 $0 Implemented
OK0642 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,265 $10 Implemented
OK0642 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $900 Implemented
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
OK0639 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $258 $717 Implemented
OK0639 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $6,583 $160 Implemented