IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0717 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,551 $53,370 Implemented
OK0717 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,466 $1,039 Implemented
OK0717 # 05 Y:2005 05 2005 DEVELOP A REPAIR/REPLACE POLICY $1,002 $9,712 Implemented
OK0714 # 05 Y:2005 05 2005 $10,600 $0 Implemented
OK0714 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,299 $70 Implemented
OK0714 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $4,058 $920 Implemented
OK0714 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,721 $117,780 Implemented
OK0713 # 04 Y:2005 04 2005 $48,000 $35 Implemented
OK0713 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,346 $35 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented
OK0710 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,746 Implemented
OK0710 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,475 $3,550 Implemented
OK0709 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $3,684 $1,030 Implemented
OK0708 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,070 $700 Implemented
OK0708 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,450 $26,280 Implemented
OK0708 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $37,832 $13,050 Implemented
OK0708 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $1,327 Implemented
OK0708 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $6,700 Implemented
OK0708 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $6,087 Implemented
OK0707 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,639 $6,750 Implemented
OK0707 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,571 $25,675 Implemented
OK0706 # 02 Y:2005 02 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,672 $13,451 Implemented
OK0706 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,579 $1,500 Implemented
OK0702 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $234 $530 Implemented