IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0955 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $11,297 Implemented
OK0955 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $2,140 Implemented
OK0955 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,112 $1,100 Implemented
OK0955 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,925 $572 Implemented
OK0955 # 03 Y:2016 03 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $598 $220 Implemented
OK0955 # 02 Y:2016 02 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,478 $10,800 Implemented
OKO952 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,312 $0 Implemented
OKO952 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,284 $6,222 Implemented
OKO952 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,021 $29,085 Implemented
OKO952 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,072 $32,000 Implemented
OK0948 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $382 $1,310 Implemented
OK0948 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $7,251 $25,830 Implemented
OK0948 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $58 $203 Implemented
OK0948 # 06 Y:2016 06 2016 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $27,228 $83,600 Implemented
OK0948 # 02 Y:2016 02 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,510 $2,320 Implemented
OK0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $1,000 Implemented
OK0940 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $1,433 $1,280 Implemented
OK0940 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $2,782 Implemented
OK0938 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $26,300 $47,542 Implemented
OK0938 # 09 Y:2016 09 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,693 $3,236 Implemented
OK0938 # 05 Y:2016 05 2016 INSTALL SET-BACK TIMERS $317 $344 Implemented
OK0938 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,405 $59,664 Implemented
OK0937 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,667 $5,324 Implemented
OK0937 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,445 $12,000 Implemented
OK0937 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,346 $88,560 Implemented