IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented
OR0707 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $1,431 $5,365 Implemented
OR0707 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,481 $19,583 Implemented
OR0707 # 04 Y:2018 04 2018 REDUCE FLUID FLOW RATES $6,509 $7,384 Implemented
OR0707 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $7,954 $8,965 Implemented
OR0707 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,884 $53,702 Implemented
OR0706 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $854 $0 Implemented
OR0706 # 04 Y:2018 04 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,000 $24,775 Implemented
OR0706 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $12,552 $1,970 Implemented
OR0705 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,817,773 $8,000,000 Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented
OR0699 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $6,151 $23,153 Implemented
OR0699 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,314 $3,982 Implemented
OR0699 # 01 Y:2018 01 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,167 $1,495 Implemented
OR0698 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,148 $325 Implemented
OR0698 # 03 Y:2018 03 2018 USE HEAT PUMP FOR SPACE CONDITIONING $12,461 $22,850 Implemented
OR0698 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,374 $9,440 Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented