IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0125 # 07 Y:2001 07 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,370 $0 Implemented
LE0125 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $466 $0 Implemented
LE0125 # 02 Y:2001 02 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,926 $0 Implemented
LE0121 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $756 $1,000 Implemented
LE0121 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,570 $2,500 Implemented
LE0121 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,495 $0 Implemented
LE0121 # 02 Y:2001 02 2001 INSULATE FEEDWATER TANK $498 $260 Implemented
LE0119 # 05 Y:2001 05 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,872 $18,500 Implemented
LE0119 # 04 Y:2001 04 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,921 $1,000 Implemented
LE0119 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,434 $0 Implemented
LE0119 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,354 $1,920 Implemented
WV0223 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,567 $44 Implemented
WV0223 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,680 $220 Implemented
WV0223 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,692 $300 Implemented
WV0223 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,635 $1,344 Implemented
WV0223 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,270 $124 Implemented
WV0222 # 12 Y:2001 12 2001 $45,760 $5,000 Implemented
WV0222 # 11 Y:2001 11 2001 RECYCLE FLUORESCENT LAMPS $3,390 $352 Implemented
LE0118 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $480 $0 Implemented
LE0118 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $135 Implemented
WV0222 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,685 $880 Implemented
WV0222 # 06 Y:2001 06 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,220 $1,792 Implemented
WV0222 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,491 $44 Implemented
WV0222 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,296 $1,000 Implemented
WV0222 # 13 Y:2001 13 2001 $15,000 $332 Implemented