IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0148 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
LE0148 # 05 Y:2002 05 2002 INSULATE FEEDWATER TANK $121 $260 Implemented
LE0148 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $300 Implemented
LE0148 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $750 Implemented
LE0148 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,308 $990 Implemented
LE0148 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $4,095 Implemented
LE0147 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,429 $900 Implemented
LE0147 # 02 Y:2002 02 2002 REPAIR OR REPLACE STEAM TRAPS $6,177 $4,200 Implemented
LE0147 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,478 $750 Implemented
LE0146 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $1,559 $3,000 Implemented
LE0146 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,443 $0 Implemented
LE0145 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,033 $3,718 Implemented
LE0145 # 03 Y:2002 03 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,820 $0 Implemented
LE0145 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,365 $0 Implemented
LE0142 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $1,500 Implemented
LE0142 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,299 $750 Implemented
LE0142 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $4,719 $400 Implemented
LE0141 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,018 $0 Implemented
LE0141 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,005 $100 Implemented
LE0141 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,139 $882 Implemented
LE0137 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $14,099 $11,750 Implemented
LE0137 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,615 $3,000 Implemented
LE0134 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,676 $1,200 Implemented
LE0134 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,609 $25,249 Implemented
LE0134 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,457 $1,500 Implemented