IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0398 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,891 $900 Implemented
WV0398 # 15 Y:2009 15 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,030 $0 Implemented
WV0398 # 08 Y:2009 08 2009 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $10,882 $1,000 Implemented
WV0398 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,235 $419 Implemented
WV0398 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $11,204 $793 Implemented
WV0395 # 10 Y:2009 10 2009 INSTALL OCCUPANCY SENSORS $485 $300 Implemented
WV0395 # 08 Y:2009 08 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $18,362 $1,925 Implemented
WV0395 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $26,253 $2,304 Implemented
WV0395 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $144,811 $1,000 Implemented
LE0292 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,073 $3,000 Implemented
LE0292 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $961 $420 Implemented
LE0292 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,415 $180 Implemented
LE0292 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,667 $27,000 Implemented
LE0292 # 04 Y:2009 04 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,921 $3,000 Implemented
LE0292 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,459 $200 Implemented
LE0293 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,864 $700 Implemented
LE0293 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,105 $2,932 Implemented
LE0293 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,797 $1,800 Implemented
LE0293 # 01 Y:2009 01 2009 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $25,144 $15,000 Implemented
LE0293 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,196 $58,455 Implemented
LE0293 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $1,675 Implemented
LE0293 # 05 Y:2009 05 2009 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,697 $27,600 Implemented
LE0291 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,457 $1,120 Implemented
LE0291 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,836 $560 Implemented
LE0291 # 03 Y:2009 03 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,557 $2,500 Implemented