IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0310 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,531 $10,000 Implemented
LE0310 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,363 $200 Implemented
LE0310 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,225 $20 Implemented
LE0310 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,484 $1,420 Implemented
LE0310 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,986 $2,500 Implemented
WV0419 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $528 Implemented
WV0419 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,262 $161,162 Implemented
LE0308 # 01 Y:2010 01 2010 INSTALL TIMERS AND/OR THERMOSTATS $21,676 $250 Implemented
LE0308 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,842 $6,180 Implemented
LE0308 # 02 Y:2010 02 2010 REPLACE BOILER $18,600 $210,000 Implemented
LE0309 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,494 $40 Implemented
LE0309 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $21,770 $250 Implemented
LE0309 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,657 $1,000 Implemented
LE0309 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $23,403 $5,772 Implemented
LE0309 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,925 $0 Implemented
LE0309 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,018 $2,431 Implemented
LE0307 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $15,010 $125 Implemented
LE0307 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,286 $800 Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $655 $5,000 Implemented
WV0413 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,291 $154,121 Implemented
WV0413 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,418 $0 Implemented