IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

604

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented
MI0164 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $80,047 $6,886 Implemented
MI0164 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,553 $22,366 Not Implemented
MI0164 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,799 $40 Implemented
MI0164 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,597 $4,400 Implemented
MI0164 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0164 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,297 $40 Implemented
MI0164 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,657 $4,400 Not Implemented
MI0164 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $1,032 Implemented
MI0164 # 10 Y:2008 10 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,174 $260 Not Implemented
MI0164 # 11 Y:2008 11 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $842 $0 Not Implemented
MI0162 # 01 Y:2008 01 2008 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $1,069,901 $2,000,000 Not Implemented
MI0162 # 02 Y:2008 02 2008 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $98,398 $18,460 Implemented
MI0162 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,183 $45,980 Not Implemented
MI0162 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $73,832 $1,750 Implemented
MI0162 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $61,527 $56,000 Not Implemented
MI0162 # 06 Y:2008 06 2008 REPAIR OR REPLACE STEAM TRAPS $11,109 $400 Implemented
MI0162 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,769 $1,210 Implemented
MI0162 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,419 $4,800 Not Implemented
MI0162 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,630 $40 Implemented
MI0160 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0160 # 02 Y:2008 02 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,048 $8,641 Not Implemented
MI0160 # 03 Y:2008 03 2008 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $16,476 $474 Implemented
MI0160 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,340 $15,475 Not Implemented
MI0160 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,705 $17,226 Implemented