Search recommendations based on selected criteria.
RESET

425

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
CL1803 # 04 Y:2018 TURN OFF EQUIPMENT WHEN NOT IN USE $386 $0
CL1803 # 03 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,656 $2,080
CL1803 # 02 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,516 $9,852
CL1803 # 01 Y:2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $40,277 $14,300
CL1704 # 03 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,811 $21,000
CL1704 # 02 Y:2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $11,470 $15,000
CL1703 # 04 Y:2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,100 $2,000
CL1703 # 02 Y:2017 ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR $28,843 $0
CL1703 # 01 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,383 $20,450
CL1701 # 05 Y:2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500
CL1701 # 04 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515
CL1701 # 01 Y:2017 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING $36,942 $10,000
CL1701 # 03 Y:2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650
NC0582 # 11 Y:2016 DEVELOP A REPAIR/REPLACE POLICY $1,782 $5,865
NC0582 # 10 Y:2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,578 $500
Back to Top