IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0406 # 06 Y:1990 06 1990 KEEP LAMPS AND REFLECTORS CLEAN $783 $1,275 Not Implemented
GT0422 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,600 $1,000 Implemented
GT0422 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,202 $172 Implemented
GT0421 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,820 $500 Implemented
GT0421 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,940 $3,250 Not Implemented
GT0421 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $657 $0 Not Implemented
GT0421 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $482 $954 Implemented
GT0421 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $129 $155 Not Implemented
GT0421 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61 $38 Implemented
TN0406 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,172 $10,820 Not Implemented
TN0406 # 02 Y:1990 02 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $4,734 $2,000 Not Implemented
TN0406 # 01 Y:1990 01 1990 REDESIGN PROCESS $5,552 $21,192 Not Implemented
GT0423 # 01 Y:1990 01 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,280 $0 Not Implemented
TN0406 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Not Implemented
TN0406 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $2,139 $0 Not Implemented
GT0423 # 08 Y:1990 08 1990 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,250 $7,000 Implemented
GT0423 # 07 Y:1990 07 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $1,600 Implemented
GT0423 # 06 Y:1990 06 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,500 $500 Implemented
GT0423 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,600 $2,000 Implemented
GT0423 # 09 Y:1990 09 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,684 $11,000 Not Implemented
GT0422 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,936 $1,790 Implemented
GT0423 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $668 $500 Implemented
GT0422 # 04 Y:1990 04 1990 IMPROVE LUBRICATION PRACTICES $350 $0 Implemented
GT0423 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,135 $10,029 Implemented
GT0423 # 04 Y:1990 04 1990 IMPROVE LUBRICATION PRACTICES $2,000 $0 Implemented