IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
TN0192 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $940 $200 Implemented
TN0192 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $325 $12,000 Implemented
TN0192 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,800 $0 Implemented
TN0191 # 02 Y:1983 02 1983 USE RADIANT HEATER FOR SPOT HEATING $3,251 $5,000 Implemented
TN0191 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,027 $10,000 Implemented
TN0190 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60 $0 Implemented
TN0190 # 02 Y:1983 02 1983 INSTALL SET-BACK TIMERS $1,000 $0 Implemented
TN0190 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $300 Implemented
TN0170 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,840 $500 Implemented
TN0180 # 03 Y:1983 03 1983 REDUCE VENTILATION AIR $3,500 $200 Implemented
TN0180 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $100 Implemented
TN0180 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $21,000 $600 Implemented
TN0170 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $13,230 $4,000 Implemented
TN0170 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,000 Implemented
TN0170 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,220 $15 Implemented
TN0179 # 03 Y:1983 03 1983 USE SOLAR HEAT TO HEAT WATER $826 $24,000 Implemented
TN0179 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $2,291 $5,700 Implemented
TN0179 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $8,400 $5,000 Implemented
TN0177 # 03 Y:1983 03 1983 USE MINIMUM STEAM OPERATING PRESSURE $2,625 $400 Implemented
TN0177 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,540 $400 Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented