IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0101 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,857 $759 Implemented
AR0101 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,212 $1,048 Implemented
AR0101 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $817 $300 Implemented
AR0101 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $70 Implemented
AR0101 # 08 Y:1996 08 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,526 $1,900 Implemented
AR0101 # 09 Y:1996 09 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,162 $0 Implemented
AR0101 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,305 $350 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0586 # 09 Y:1996 09 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,410 $0 Implemented
TN0586 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,080 $7,880 Implemented
TN0595 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $34,060 $12,880 Implemented
TN0595 # 07 Y:1996 07 1996 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $2,600 $0 Implemented
TN0595 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,230 $7,525 Implemented
TN0595 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $9,770 $5,400 Implemented
TN0592 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,505 $0 Implemented
TN0592 # 04 Y:1996 04 1996 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,820 $5,440 Implemented
TN0590 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,321 $8,150 Implemented
TN0590 # 05 Y:1996 05 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $640 $1,120 Implemented
TN0590 # 01 Y:1996 01 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $162,200 $297,300 Implemented
TN0590 # 02 Y:1996 02 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,400 $0 Implemented
TN0589 # 02 Y:1996 02 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,430 $2,280 Implemented
TN0588 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $290 $845 Implemented