IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0083 # 03 Y:2011 03 2011 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,378 $1,200 Implemented
TT0083 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $9,142 $15,000 Implemented
TT0079 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,937 $0 Implemented
TT0079 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
TT0079 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $0 Implemented
TT0079 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $508 $0 Implemented
TT0076 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,661 $5,000 Implemented
TT0076 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,311 $0 Implemented
TT0081 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,580 $22,680 Implemented
TT0081 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,700 $103,900 Implemented
TT0081 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $8,160 Implemented
TT0081 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,694 $70,320 Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
TT0082 # 07 Y:2011 07 2011 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $952 $2,625 Implemented
TT0082 # 05 Y:2011 05 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,673 $15 Implemented
TT0082 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,256 $1,480 Implemented
TT0082 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,923 $18,044 Implemented
TT0075 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $47,625 $21,000 Implemented
TT0075 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,202 $14,000 Implemented
TT0075 # 05 Y:2011 05 2011 INSTALL COMMON HEADER ON COMPRESSORS $44,869 $32,200 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented
TT0078 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,023 $1,480 Implemented