IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,495

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0486 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $22,640 $68,400 Not Implemented
CO0486 # 04 Y:2001 04 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $7,590 $10,000 Not Implemented
CO0486 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,140 $21,600 n/a
CO0486 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $2,490 $6,000 Not Implemented
UU0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,950 $280 Implemented
UU0005 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $798 $932 Implemented
UU0005 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,396 $300 Not Implemented
UU0005 # 04 Y:2001 04 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,070 $10,000 Not Implemented
UU0005 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,575 Not Implemented
CO0485 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $229,700 $118,560 Implemented
CO0485 # 02 Y:2001 02 2001 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $59,590 $30,000 n/a
CO0485 # 03 Y:2001 03 2001 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $40,450 $30,000 Not Implemented
CO0485 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,060 $28,000 Implemented
CO0485 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $23,640 $18,000 Implemented
CO0485 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $6,730 $23,000 Not Implemented
CO0485 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $5,980 Implemented
CO0485 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,680 $8,380 Implemented
CO0485 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $2,340 Implemented
CO0485 # 10 Y:2001 10 2001 $112,750 $100,000 Implemented
AM0401 # 01 Y:2001 01 2001 REPAIR OR REPLACE STEAM TRAPS $147,000 $800 Implemented
AM0401 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $76,500 $0 Not Implemented
AM0401 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $46,800 $1,400 Implemented
AM0401 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,020 $119,000 n/a
AM0401 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $13,200 $28,000 n/a
AM0401 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,300 $0 Implemented