IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0018 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,721 $1,900 Implemented
UU0018 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,387 $127,085 Implemented
UU0018 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,006 $1,000 Implemented
UU0017 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $694 $700 Implemented
UU0017 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $220 Implemented
UU0016 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $35 Implemented
UU0016 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,195 $915 Implemented
UU0014 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $440 Implemented
UU0014 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,319 $60 Implemented
UU0013 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $317 $500 Implemented
UU0013 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $2,636 Implemented
UU0011 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55,587 $47,184 Implemented
UU0011 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $44,401 $4,000 Implemented
UU0011 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $745 $140 Implemented
UU0011 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,413 $85,168 Implemented
UU0003 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,867 $140 Implemented
UU0004 # 05 Y:2001 05 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,494 $0 Implemented
UU0004 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,903 $875 Implemented
UU0003 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,062 $4,761 Implemented
UU0010 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,495 $680 Implemented
UU0010 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $761 $600 Implemented
UU0010 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,643 $75 Implemented
UU0010 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,308 $9,973 Implemented
UU0012 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,600 $5,000 Implemented
UU0009 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,476 $18,287 Implemented