IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,156

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0202 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,105 $0 Implemented
DL0202 # 04 Y:2021 04 2021 BURN WASTE OIL FOR HEAT $12,350 $5,000 Implemented
DL0202 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,460 $1,000 Implemented
DL0202 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,593 $750 Implemented
NC0646 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $694 $362 Implemented
NC0646 # 01 Y:2020 01 2020 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $377,240 $300,000 Implemented
WV0590 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,957 $813 Implemented
WV0590 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,881 $1,468 Implemented
WV0590 # 11 Y:2020 11 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $1,000 Implemented
WV0590 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,451 $66,168 Implemented
WV0590 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $16,468 $5,109 Implemented
WV0590 # 12 Y:2020 12 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 Implemented
WV0590 # 13 Y:2020 13 2020 DEVELOP A REPAIR/REPLACE POLICY $101 $271 Implemented
NC0645 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,683 $40,000 Implemented
NC0641 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,143 $35,000 Implemented
WV0586 # 03 Y:2019 03 2019 DEVELOP A REPAIR/REPLACE POLICY $3,336 $894 Implemented
WV0586 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,909 $2,793 Implemented
WV0586 # 05 Y:2019 05 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,701 $1,000 Implemented
WV0586 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $31,539 $1,630 Implemented
NC0633 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,254 $27,000 Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0617 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,137 $12,000 Implemented
NC0617 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $352 $90 Implemented