IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0666 # 11 Y:1999 11 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $1,200 Implemented
TN0666 # 10 Y:1999 10 1999 USE SYNTHETIC LUBRICANT $900 $0 Implemented
TN0666 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,120 $1,460 Implemented
TN0666 # 08 Y:1999 08 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,433 $800 Implemented
TN0666 # 06 Y:1999 06 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,640 $4,620 Implemented
TN0666 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,902 $5,705 Implemented
TN0666 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $12,160 $3,250 Implemented
TN0666 # 02 Y:1999 02 1999 $18,800 $16,000 Implemented
OD0146 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $185 $90 Implemented
OD0146 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $85 $20 Implemented
OD0146 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $643 $0 Implemented
OD0145 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $1,280 $495 Implemented
OD0145 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,396 $220 Implemented
OD0143 # 04 Y:1999 04 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $228 $130 Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
OD0140 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,213 $100 Implemented
OD0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $849 $800 Implemented
OD0133 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,321 $2,500 Implemented
OD0130 # 01 Y:1999 01 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $378 $140 Implemented
OD0127 # 04 Y:1999 04 1999 COMBINE UTILITY METERS $9,570 $5,000 Implemented
OD0127 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,582 $240 Implemented
OD0127 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,954 $5,472 Implemented
OD0126 # 05 Y:1999 05 1999 IMPROVE COMBUSTION CONTROL CAPABILITY $1,540 $3,000 Implemented
OD0126 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,728 $67,670 Implemented