IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0350 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,138 $10,500 Not Implemented
NC0350 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $100 Implemented
NC0350 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $12,275 $1,000 Implemented
NC0350 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,381 $2,000 Not Implemented
NC0350 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $122,745 $114,000 Not Implemented
NC0340 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $4,704 $1,500 Implemented
NC0340 # 12 Y:2006 12 2006 $18,650 $20,000 Not Implemented
NC0340 # 11 Y:2006 11 2006 $20,000 $20,000 Implemented
NC0340 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $377 Not Implemented
NC0340 # 08 Y:2006 08 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $500 Implemented
NC0340 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $879 $220 Implemented
NC0340 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $50 Implemented
NC0340 # 02 Y:2006 02 2006 CLOSE OFF UNNEEDED STEAM LINES $13,322 $0 Implemented
NC0340 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $1,720 $1,800 Implemented
NC0340 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,698 $7,600 Not Implemented
NC0340 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,998 $0 Implemented
NC0340 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,146 $1,700 Not Implemented
NC0340 # 13 Y:2006 13 2006 $61,400 $25,000 Not Implemented
NC0344 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $48,795 $35,000 Not Implemented
NC0344 # 01 Y:2006 01 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $789,735 $918,265 Not Implemented
NC0344 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,955 $5,000 Not Implemented
NC0344 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $4,423 Implemented
NC0344 # 02 Y:2006 02 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $460,800 $118,971 Implemented
NC0344 # 04 Y:2006 04 2006 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $62,722 $50,000 Implemented
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented