IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0114 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,082 $3,200 Implemented
WM0114 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,956 $0 Implemented
WM0114 # 05 Y:2017 05 2017 USE RADIANT HEATER FOR SPOT HEATING $4,330 $1,815 Implemented
WM0114 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,449 $332 Implemented
WM0114 # 01 Y:2017 01 2017 MAINTAIN MACHINES TO REDUCE LEAKS $16,398 $20,000 Implemented
WM0113 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,921 $18,856 Implemented
WM0112 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,480 $14,400 Implemented
WM0112 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,535 $3,553 Implemented
WM0112 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $10,947 $460 Implemented
WM0112 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,320 $0 Implemented
WM0112 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,713 $150,000 Implemented
WM0110 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $38,561 $90,000 Implemented
WM0110 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,832 $23,000 Implemented
WM0109 # 10 Y:2017 10 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $394 $0 Implemented
WM0109 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,520 $0 Implemented
WM0106 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $1,138 $600 Implemented
WM0106 # 08 Y:2017 08 2017 USE RADIANT HEATER FOR SPOT HEATING $2,133 $3,818 Implemented
WM0106 # 07 Y:2017 07 2017 USE OPTIMUM TEMPERATURE $1,605 $0 Implemented
WM0106 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,204 $0 Implemented
WM0106 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,352 $3,278 Implemented
WM0105 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $3,400 Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0101 # 07 Y:2017 07 2017 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $251 $200 Implemented