IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0229 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $1,200 Implemented
WV0229 # 09 Y:2001 09 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $6,189 $11,368 Not Implemented
WV0229 # 04 Y:2001 04 2001 INSTALL TIMERS AND/OR THERMOSTATS $3,599 $350 Not Implemented
WV0229 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $1,215 $450 Implemented
WV0229 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,192 $100 Implemented
WV0229 # 02 Y:2001 02 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $776 $750 Implemented
WV0229 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,684 $4,400 Not Implemented
WV0229 # 12 Y:2001 12 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,680 $220 Implemented
WV0229 # 14 Y:2001 14 2001 $13,200 $2,000 Implemented
WV0229 # 13 Y:2001 13 2001 $45,000 $15,000 Implemented
WV0229 # 10 Y:2001 10 2001 INSTALL OCCUPANCY SENSORS $2,118 $450 Not Implemented
WV0229 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $400 Not Implemented
WV0229 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $948 $300 Implemented
WV0229 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $861 $400 Not Implemented
WV0228 # 08 Y:2001 08 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,128 $1,200 Implemented
WV0228 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $187 $98 Implemented
WV0228 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $147 $320 Not Implemented
WV0228 # 01 Y:2001 01 2001 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $221 $130 Not Implemented
WV0228 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,117 $720 Implemented
WV0228 # 09 Y:2001 09 2001 RECOVER WASTE HEAT FROM EQUIPMENT $18,975 $5,660 Not Implemented
WV0228 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,801 $60 Implemented
WV0228 # 13 Y:2001 13 2001 $110,000 $858,000 Not Implemented
WV0228 # 10 Y:2001 10 2001 BURN WASTE OIL FOR HEAT $318 $953 Not Implemented
WV0228 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,326 $1,245 Implemented
WV0228 # 11 Y:2001 11 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $850 $2,547 Implemented