IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0530 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,195 $8,450 Implemented
WV0530 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,409 $1,036 Implemented
WV0530 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $6,845 $5,000 Implemented
WV0530 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,558 $72,000 Implemented
WV0530 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,714 $16,453 Implemented
WV0530 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $45,649 $8,838 Implemented
WV0530 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,987 $1,000 Implemented
WV0525 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,826 $10,031 Implemented
WV0525 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,504 $362 Implemented
WV0525 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,290 $6,270 Implemented
WV0525 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,575 $4,088 Implemented
WV0525 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $640 $11 Implemented
WV0524 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $1,984 $1,080 Implemented
WV0524 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $269 $370 Implemented
WV0524 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,139 $10,151 Implemented
WV0524 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,329 $30,168 Implemented
WV0524 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,003 $305 Implemented
WV0524 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,286 $65 Implemented
WV0523 # 07 Y:2016 07 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,154 $500 Implemented
WV0523 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,412 $4,664 Implemented
WV0523 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,867 $2,686 Implemented
WV0523 # 05 Y:2016 05 2016 DEVELOP A REPAIR/REPLACE POLICY $2,819 $1,235 Implemented
WV0523 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $4,985 Implemented
WV0522 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $560 $467 Implemented
WV0522 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $300 $543 Implemented