IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0636 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,183 $4,755 Not Implemented
WV0636 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,943 $7,374 Not Implemented
WV0636 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $670 $78 Implemented
WV0636 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,625 $18,739 Implemented
WV0636 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,546 $5,490 Not Implemented
WV0636 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $299 $465 Implemented
WV0636 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,927 $2,021 Implemented
WV0636 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,868 $465 Implemented
WV0636 # 08 Y:2022 08 2022 DEVELOP A REPAIR/REPLACE POLICY $217 $598 Implemented
WV0635 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $546 $1,571 Implemented
WV0635 # 09 Y:2022 09 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $672 $1,500 Implemented
WV0635 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $3,167 $1,125 Not Implemented
WV0635 # 02 Y:2022 02 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,325 $5,360 Not Implemented
WV0635 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $949 $525 Implemented
WV0635 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $57 $88 Implemented
WV0635 # 07 Y:2022 07 2022 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,027 $394 Implemented
WV0635 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $3,209 $6,354 Not Implemented
WV0635 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $218 Implemented
WV0635 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $4,945 Implemented
WV0635 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,179 $6,500 Not Implemented
WV0633 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $246 $878 Implemented
WV0633 # 07 Y:2022 07 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,011 $1,500 Implemented
WV0633 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $14,598 $23,000 Not Implemented
WV0633 # 03 Y:2022 03 2022 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $4,724 $12,236 Not Implemented
WV0633 # 04 Y:2022 04 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,626 $4,080 Not Implemented