IAC logo
IAC Assessment: AM0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product PAPER FIBER INSULATION
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pieces
Production Hrs. Annual 2,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,711 453,986 kWh $0.10
Other Energy $4,500 563 MMBtu $7.99
TOTAL ENERGY COSTS $49,211
RECOMMENDED SAVINGS* $1,885 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,730
#|Description Savings
Cost
Status Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$1,450
Cost:
-
- - $450 56 $1,000 - -
-
kWh
$450
56
MMBtu
$1,000
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$280
Cost:
$300
$280 3,810 - - - - $280
3,810
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$155
Cost:
-
$155 3,224 - - - - $155
3,224
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,885
Cost:
$300
$435 7,034 $450 56 $1,000 - $435
7,034
kWh
$450
56
MMBtu
$1,000
-
$
TOTAL IMPLEMENTED Savings:
$1,730
Cost:
$300
$280 3,810 $450 56 $1,000 - $280
3,810
kWh
$450
56
MMBtu
$1,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes