IAC logo
IAC Top Tens
Sponsored by:
DOE MESC
IAC logo
IAC Top Tens
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The IAC Top Tens page displays the top ten recommendations based on the following criteria.
Reset
ARC Description Recc'd Average Savings Average Cost Average Payback Imp Rate
1 3.7392 1: 3.7392 APPLY A PROTECTIVE COATING TO RACKS AND TANKS 5 $2,660 $24 0.0 100.0%
2 2.4152 2: 2.4152 USE ONLY CERTIFIED MOTOR REPAIR SHOPS 22 $3,109 $4,055 1.3 86.7%
3 2.4157 3: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM 256 $7,720 $2,127 0.7 86.3%
4 2.2135 4: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS 876 $43,061 $4,635 0.4 83.7%
5 2.4236 5: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES 10,245 $6,431 $1,801 0.5 82.2%
6 2.4227 6: 2.4227 USE COMPRESSOR AIR FILTERS 86 $3,236 $2,362 0.8 80.6%
7 2.2113 7: 2.2113 REPAIR OR REPLACE STEAM TRAPS 406 $36,358 $8,127 0.5 79.6%
8 2.1134 8: 2.1134 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES 15 $32,748 $7,486 0.7 78.6%
9 4.821 9: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES 91 $3,829 $97 0.1 77.0%
10 2.6127 10: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT 103 $4,251 $3,994 0.8 77.0%